Introduction

A modern day retrofit, working with Fortem

Working with Fortem Solutions ltd this install was a bespoke design for Bassetlaw council providing a modern day retrofit installation aimed at elderly tenants.

The design was aimed to provide a more carbon neutral installation with an emphasis on reducing electricity bills and creating a better environment more occupants of this facility. Additional features on this project were PV solar panels, air source heat pumps, dementia friendly accessories, intelligent lighting and a move towards the rapidly growing EV charging market.

Installation & Design

Scarbrook working at Larwood house, installation and design

The works included in the retrofit process include:

  • Rip out of existing electrical installation, including lighting small power and containment.
  • 1st fixing of all flats including all corridor, communal and exterior lighting areas.
  • Installation of cable containment.
  • 2nd fixing of all flats for small power and LED low-energy lighting with the addition of Dementia friendly accessories.
  • Low energy intelligent LED lighting with PIR movement sensors throughout.
  • Installation of bespoke distribution boards by Hager UK, these units have built in smart meters giving provision to show power usage over individual circuits.
  • Installation of smart EV car chargers providing easy access for tenants and visitors to charge their cars using the Rolec smart app.
  • PV solar panels proving an offset on energy costs for communal areas.

The design for this project was a completed by BEM Services and Scarbrook was challenged to create a De–carbonisation strategy in order to future proof the install and to give the care home longevity.

Challenges

Utilising our working relationship with Fortem to adapt existing infrastructure

Working with local DNOs has sometimes been challenging as working towards their time schedules has proved difficult, on this particular installation it was decided at a late stage that the existing power infrastructure was not acceptable and a new supply to the building would be needed.

Having a good working relationship with Fortem and their construction managers is essential as a major combined effort in a short period was needed to ensure the enabling works were in place prior to the cable installs and re powering of the building. The ASHP install was carried out by our mechanical arm of the business, being an M&E company has its advantages as the combined install is carried out by the same company this alleviates any miss communication and install issues.

Conclusion

An advanced modernisation upgrade gives Bassetlaw District Council significant savings

This project was our most advanced modernisation upgrade to date and has shown significant savings for our client Bassetlaw District Council.

The additional installation of renewables combined with the latest technology in electrical infrastructure has given the care facility not just a modern leading edge look but will make the project sustainable for the future and hopefully pave the way for future installs of this nature.

Do you feel the project was successful, and if so, why?

The project was an overall success for Fortem, the client and our trusted supply chain partners. Scarbrook contributed by showing a number of key attributes as below:

  • Effective Planning & Design
  • Highly Skilled Workforce
  • Communication levels always above the expected
  • Adaptability
  • Risk Management

On top of this, our client was extremely complimentary of the works undertaken by Scarbrook.

Were you satisfied with the quality of our service and products, and if so, what did you particularly like?

Absolutely. Having worked together for over 10 years, we know exactly what to expect when it comes to partnering with Scarbrook. One of their key strengths which personally makes us want to work with them time and time again is their approach to new work, and how flexible they can be in prioritising works for their client. Another strength would be their professionalism from the operatives on site, right to the directors. It’s clear they have implemented a strong culture and the right values throughout the organisation.

Was there any particular team member/team members who impacted on the project?

Being totally honest, I could say everyone, but real stand outs for these works were Tom Gibson, Mark Bennett, Richard Wood & Andy Exley.

What separates Scarbrook from their Competitors?

What separates them from their competitors above all for me is how they value strong working relationships with their client. They do this by:

  • Offering transparent pricing
  • Showing commitment to continuous improvement
  • Satisfying not only their client in us, but our client
  • Exceeding H&S Requirements
  • Quality Workmanship
  • Always reliable and have a proven track record.